DIAGNOSTIC CENTER       MEDICAL       SAIDA | LEBANON

FIRST FLOOR LEVEL

  • 1 - Public Lobby
  • 2 - Reception and Waiting Area
  • 3 - Nursing Station
  • 4 - Staff Toilets
  • 5 - Public Toilets
  • 6 - Corridor
  • 7 - Clinic
  • 8 - Toilet
  • 9 - Praying Room
  • 10 - Conference Room
  • 11 - Kitchennete
  • 12 - Echo Room
  • 13 - Stress Room
  • 14 - Vascular Room
  • 15 - Exam Room and Vital Signs
  • 16 - Administration Office
  • 17 - Information Desk
  • 18 - Electrical Room
  • 19 - IT Room
  • 20 - Mamotherapy
  • 21 - Changing Area
  • 22 - Lobby
  • 23 - Digital Radiology
  • 24 - Changing Area
  • 25 - Doctors and PACS Room
  • 26 - Corridor
  • 27 - CT Exam
  • 28 - CT Control
  • 29 - Changing Area
  • 30 - Toilet
  • 31 - Recovery Area
  • 32 - Changing Area
  • 33 - Magnet Room
  • 34 - MR Control
  • 35 - Terrace
  • 36 - Equipment Room
  • 37 - Ultrasound Room
  • 38 - Toilet
  • 39 - Doctor Toilet
  • 40 - Radiology Toilet

HEALTH

MEDICAL
RENOVATION
PROJECT

“Renovating medical places goes beyond the physical transformation of the space; it holds the power to enhance the overall experience for both patients and healthcare professionals.”

DIAGNOSTIC CENTER

MEDICAL

SAIDA | LEBANON

FIRST FLOOR LEVEL

  • 1 - Public Lobby
  • 2 - Reception and Waiting Area
  • 3 - Nursing Station
  • 4 - Staff Toilets
  • 5 - Public Toilets
  • 6 - Corridor
  • 7 - Clinic
  • 8 - Toilet
  • 9 - Praying Room
  • 10 - Conference Room
  • 11 - Kitchennete
  • 12 - Echo Room
  • 13 - Stress Room
  • 14 - Vascular Room
  • 15 - Exam Room and Vital Signs
  • 16 - Administration Office
  • 17 - Information Desk
  • 18 - Electrical Room
  • 19 - IT Room
  • 20 - Mamotherapy
  • 21 - Changing Area
  • 22 - Lobby
  • 23 - Digital Radiology
  • 24 - Changing Area
  • 25 - Doctors and PACS Room
  • 26 - Corridor
  • 27 - CT Exam
  • 28 - CT Control
  • 29 - Changing Area
  • 30 - Toilet
  • 31 - Recovery Area
  • 32 - Changing Area
  • 33 - Magnet Room
  • 34 - MR Control
  • 35 - Terrace
  • 36 - Equipment Room
  • 37 - Ultrasound Room
  • 38 - Toilet
  • 39 - Doctor Toilet
  • 40 - Radiology Toilet

HEALTH

MEDICAL
RENOVATION
PROJECT

“Renovating medical places goes beyond the physical transformation of the space; it holds the power to enhance the overall experience for both patients and healthcare professionals.”

DIAGNOSTIC CENTER       MEDICAL       SAIDA | LEBANON

FIRST FLOOR LEVEL

  • 1 - Family Waiting
  • 2 - Service Corridor
  • 3 - OR Supervisor Room
  • 4 - Lobby
  • 5 - Female Toilets / Changing Area / Lockers
  • 6 - Male Toilets/ Changing Area / Lockers
  • 7 - Service Lift / Stair Area
  • 8 - Linen Store
  • 9 - Corridor
  • 10 - Anathesia Room
  • 11 - Reporting Room and Doctors Lounge
  • 12 - Staff Room
  • 13 - Nursing Station
  • 14 - Patients Transfer
  • 15 - Medical Corridor
  • 16 - Sink Area
  • 17 - Operation Room 1
  • 18 - Operation Room 2
  • 19 - Sink Area
  • 20 - Operation Room 3
  • 21 - Linen Closet
  • 22 - IV Set Room
  • 23 - Equipment Store
  • 24 - Induction Room/ Anesthesia
  • 25 - Office
  • 26 - Sink Area
  • 27 - Operation Room 4
  • 28 - Medical Supply
  • 29 - Sink Area
  • 30 - Operation Room 5
  • 31 - Operation Room 6
  • 32 - Recovery Area 4
  • 33 - Clean Utility / Store
  • 34 - Dirty Utility
  • 35 - Extended Space for CSSD
  • 36 - Dirty Utility

HEALTH

MEDICAL
RENOVATION
PROJECT

“The beauty of renovating medical facilities lies in the profound impact it has on the healing environment and the well-being of those within it.”

DIAGNOSTIC CENTER

MEDICAL

SAIDA | LEBANON

FIRST FLOOR LEVEL

  • 1 - Family Waiting
  • 2 - Service Corridor
  • 3 - OR Supervisor Room
  • 4 - Lobby
  • 5 - Female Toilets / Changing Area / Lockers
  • 6 - Male Toilets/ Changing Area / Lockers
  • 7 - Service Lift / Stair Area
  • 8 - Linen Store
  • 9 - Corridor
  • 10 - Anathesia Room
  • 11 - Reporting Room and Doctors Lounge
  • 12 - Staff Room
  • 13 - Nursing Station
  • 14 - Patients Transfer
  • 15 - Medical Corridor
  • 16 - Sink Area
  • 17 - Operation Room 1
  • 18 - Operation Room 2
  • 19 - Sink Area
  • 20 - Operation Room 3
  • 21 - Linen Closet
  • 22 - IV Set Room
  • 23 - Equipment Store
  • 24 - Induction Room/ Anesthesia
  • 25 - Office
  • 26 - Sink Area
  • 27 - Operation Room 4
  • 28 - Medical Supply
  • 29 - Sink Area
  • 30 - Operation Room 5
  • 31 - Operation Room 6
  • 32 - Recovery Area 4
  • 33 - Clean Utility / Store
  • 34 - Dirty Utility
  • 35 - Extended Space for CSSD
  • 36 - Dirty Utility

HEALTH

MEDICAL
RENOVATION
PROJECT

“The beauty of renovating medical facilities lies in the profound impact it has on the healing environment and the well-being of those within it.”